Séries - Annual Reviews and Annual Reports

Seventh annual review - set Annual Review of Project Performance Audit Results - Fifth Annual Review - 1979 / 1980 - Volume 2 Annual Review of Project Performance Audit Results - Fifth Annual Review - 1979 - Volume 1

Zona de identificação

Código de referência

WB IBRD/IDA OPE-04

Título

Annual Reviews and Annual Reports

Data(s)

  • 1975 - 2000 (Produção)

Nível de descrição

Séries

Dimensão e suporte

7.49 linear feet of textual records

Zona do contexto

Entidade detentora

História do arquivo

Fonte imediata de aquisição ou transferência

Zona do conteúdo e estrutura

Âmbito e conteúdo

The series consists of records created and received by the Directors, Operation Evaluation Department (OEDDR), and the Directors-General, Operations Evaluation (DGO), which relate to the creation of Annual Reviews of OED evaluations as well as Annual Reports on Operations Evaluation (AROE).

In September 1975, the Operations Evaluation Department (OED) began issuing a report known as the Annual Review of Project Performance Audit Results (ARPPARs) as a means of disseminating the results of the project performance audits it conducted. This review presented in summary the major findings of the audit reports for completed projects and the Bank's response to them. The findings of the ARPPARs were discussed by the Executive Board's Joint Audit Committee (JAC) and JAC's findings were then reviewed by the full Board. By July 1981, a selective system of performance auditing was implemented in OED in keeping with the increase in the number of projects funded. In 1986, the report was renamed the Annual Review of Project Performance Results (ARPPR), and by 1989, the ARPPR was replaced by the Annual Review of Evaluation Results (ARER) which provided a comprehensive summary of evaluation findings. By 1997, the name of the report had changed once again to the Annual Review of Development Effectiveness (ARDE). In the ARDE, OED used the outcomes of evaluations of completed operations to provide a longer view of performance trends. Records in this series that relate to these types of Annual Reviews include drafts, correspondence, memoranda, press releases, comments, and meeting minutes.

The first Annual Report on Operations Evaluation (AROE) covering the period July 1975 - June 1976 was published in October 1976. The main purpose of the report was to indicate the status of evaluation work in the Bank and to comment on the main findings of evaluation activities. Subsequent reports reviewed the independent evaluation work performed within OED and the self-evaluation conducted by the Bank's operating departments (for example, the AROE for 1985 covered OED evaluation activities and evaluations conducted within the International Finance Corporation [IFC], the Economic Development Institute [EDI], and the Bank's economics and research staff). The format of the AROE was determined by the DGO and the plan for developing the report was made in consultation with OED. Drafts of the report were circulated to Bank managers for comments and the final version was submitted to JAC for consideration by the Bank's Board of Executive Directors in conjunction with JAC's own report on evaluation and the ARPPAR (later ARER and ARDE). Records in this series that relate to the creation of AROEs include correspondence, memoranda, initiating notes and outlines, drafts, comments, and meeting minutes.

Avaliação, selecção e eliminação

Ingressos adicionais

Sistema de arranjo

Records are arranged in five sub-series:

  • WB IBRD/IDA OPE 04-01 Working Files of the Directors, Operations Evaluation Department (OEDDR), for the Annual Review of Evaluation Results (ARER)

  • WB IBRD/IDA OPE 04-02 Working Files of the Directors-General, Operations Evaluation (DGO), for the Annual Review of Evaluation Results (ARER)

  • WB IBRD/IDA OPE 04-03 Working Files of the Directors, Operations Evaluation Department (OEDDR), for the Annual Reports on Operations Evaluation (AROE)

  • WB IBRD/IDA OPE 04-04 Working Files of the Directors-General, Operations Evaluation (DGO), for the Annual Reports on Operations Evaluation (AROE)

  • WB IBRD/IDA OPE 04-05 Shared Working Files of the Directors-General, Operations Evaluation (DGO), and the Directors, Operations Evaluation Department (OEDDR), for the Annual Reviews of Development Effectiveness (ARDE) and for Annual Reports on Operations Evaluation (AROE)

Zona de condições de acesso e utilização

Condições de acesso

Records are subject to the Internal Evaluation Group's Access to Information Policy.

Condiçoes de reprodução

Records are subject to the Copyright Policy of the World Bank Group.

Idioma do material

Script do material

Notas ao idioma e script

Características físicas e requisitos técnicos

Instrumentos de descrição

Zona de documentação associada

Existência e localização de originais

Existência e localização de cópias

Unidades de descrição relacionadas

Descrições relacionadas

Zona das notas

Identificador(es) alternativo(s)

Pontos de acesso

Pontos de acesso - Assuntos

Pontos de acesso - Locais

Pontos de acesso - Nomes

Pontos de acesso de género

Zona do controlo da descrição

Identificador da descrição

Identificador da instituição

Regras ou convenções utilizadas

Internal World Bank Group Archives rules based on ISAD(G).

Disclosure status

Nível de detalhe

Datas de criação, revisão, eliminação

4 June 2009, 2 July 2009, 11 April 2012

Línguas e escritas

Script(s)

Fontes

Zona da incorporação

Assuntos relacionados

Pessoas e organizações relacionadas

Géneros relacionados

Locais relacionados