The earliest work program and budget records in this series are the FY 1988 mid-year review records for the Policy, Planning and Research Staff (PPR). PPR, created after the May 1987 Bank reorganization, brought together existing departments from different parts of the Bank (principally the Economics and Research Staff [ERS] and the Operations Staff [OPS]). budget files maintained by Richard Woodford, Program Coordinator, Office of the Senior Vice President, Policy, Planning and Research (SVPPR) and Ziaddin Choudhury, SVPPR contain copies of PPR organizations' FY 1988 mid-year review reports; the FY 1988 PPR mid-year review report submitted by SVPPR to the Planning and budget Department (PBD) of PPR; and PBD's memo of June 29, 1988 to President Conable giving preliminary findings of PBD's review of the Bank's planning and budgeting system. PBD had responsibility for budget analysis and monitoring of work program and budget performance for the entire Bank. DECVP reported to SVPPR.
Budget files maintained by Gregory Ingram, who joined the SVPPR staff as Principal Adviser, Policy and Research, along with the Woodford and Choudhury files contain: budget and work program guidelines, submissions, reports, and memos (FYs 1989-1992); FY 1989 and FY 1990 capital budget guidelines and requests from PPR organizations for office technology and other equipment; mid-year review submissions from PPR organizations for FYs 1989 and 1990 and retrospective review submissions and drafts for FY 1989; PBD's draft mid-year review report of the FY 1989 budget forwarded to the President's Council for review; documents assembled for the PPR FY 1989 work program review meetings with PBD; and the FY 1990 PPR budget plan (management contract) developed after the Bank's FY 1990 budget was approved by the Board.
After PPR became Policy, Research and External Affairs (PRE) in 1990 and the Policy and Review Department (PRD) was created in PRE, Ingram (PRDRA) and Woodford (PRDPM) had continued responsibilities for budget (management contract) and work program coordination for PRE. Their files and those of Zmarak Shalizi (PRDPM) and Ziaddin Choudhury (PRDPM) contain copies of PRE organizations' submissions for the FY 1991 work program and budget; FY 1991 mid-year review submissions from PRE organizations; and the PRE FY 1991 mid-year review report. There is a small amount of information concerning funding of special grant programs after FY 1991. DECVP reported to PRESV.
Avaliação, selecção e eliminação
Ingressos adicionais
Sistema de arranjo
Records are arranged generally by fiscal year.
Zona de condições de acesso e utilização
Condições de acesso
Records are subject to the World Bank Policy on Access to Information.
Condiçoes de reprodução
Records are subject to the Copyright Policy of the World Bank Group.
Idioma do material
Script do material
Notas ao idioma e script
Características físicas e requisitos técnicos
Instrumentos de descrição
Zona de documentação associada
Existência e localização de originais
Existência e localização de cópias
Unidades de descrição relacionadas
Zona das notas
Identificador(es) alternativo(s)
Pontos de acesso
Pontos de acesso - Assuntos
Pontos de acesso - Locais
Pontos de acesso - Nomes
Pontos de acesso de género
Zona do controlo da descrição
Identificador da descrição
Identificador da instituição
Regras ou convenções utilizadas
Internal World Bank Group Archives rules based on ISAD(G).
Disclosure status
Nível de detalhe
Datas de criação, revisão, eliminação
3 October 2011