Series - General Subject Files of the Directors-General, Operations Evaluation

Identity area

Reference code

WB IBRD/IDA OPE-13-02

Title

General Subject Files of the Directors-General, Operations Evaluation

Date(s)

  • 1984 - 1997 (predominant 1990 - 1995) (Creation)

Level of description

Series

Extent and medium

4.16 linear feet of textual records

Context area

Archival history

Immediate source of acquisition or transfer

Content and structure area

Scope and content

This series consists primarily of reports, studies, and other issuances sent to the Director-General either for his comments or as part of a general distribution to high-level managers in the Bank. Filed with these issuances are comments and related correspondence of the Director-General and his special advisers and comments that the OED staff provided the DGO. The documents from the Kapur and Rovani eras are primarily originals, many with handwritten comments from the Directors-General. The Picciotto-eradocuments are primarily electrostatic copies. Key topics covered by the files include: mechanisms for integrating OED findings into the policy formation process of the Bank (filed under Dissemination and Feedback); evaluation criteria used in appraising projects (filed under Methodology); OEDs involvement in the monitoring and evaluation of NGO programs and in providing evaluation guidance to NGOs (filed under NGOs); OED guidelines for evaluating environmental projects (filed under Environment); planning for the 1995 G-7 Summit in Halifax (filed under G-7 Summit); the role of gender in OED work (filed under Women in Development); DGO/OED comments on the Annual Report on Portfolio Performance (ARPP) and on the disconnect between the ARPP and Completion Report/Audit Report ratings (filed under Annual Report on Portfolio Performance); and planning for the 1994 Annual Review of Evaluation Results (filed under Annual Review). Filed under Development Committee Task Force on Multilateral Development Banks (MDBs) are replies to questions and copies of documents DGO Picciottos adviser Pablo Guerrero provided to the Task Force secretary. The MDB Task Force files also contain Guerreros comments on draft background studies submitted to the Task Force. Filed under Main Complex Rehabilitation Project (MCRP) are records regarding a 1993 Bank inquiry into cost overruns for an improvement program to the Banks headquarters complex at 1818 H Street NW. That file includes copies of Robert Picciottos 1993 memoranda outlining the input he had into the funding required for the project while he was Vice President of Corporate Planning and Budget. The files also include Picciottos comments on a draft of the S. Guhan chapter, The Banks Project Lending in South Asia, 1971-1990, in Volume II of the Brookings history of the World Bank.

Appraisal, destruction and scheduling

Accruals

Accruals are expected.

System of arrangement

By subject and thereunder chronologically.

Conditions of access and use area

Conditions governing access

Records are subject to the Internal Evaluation Group's Access to Information Policy.

Conditions governing reproduction

Records are subject to the Copyright Policy of the World Bank Group.

Language of material

  • English

Script of material

Language and script notes

Physical characteristics and technical requirements

Finding aids

An inventory list is available here.

Allied materials area

Existence and location of originals

Existence and location of copies

Related units of description

Related descriptions

Notes area

Alternative identifier(s)

Access points

Subject access points

Place access points

Name access points

Genre access points

Description control area

Description identifier

Institution identifier

Rules and/or conventions used

Internal World Bank Group Archives rules based on ISAD(G).

Disclosure status

Level of detail

Dates of creation revision deletion

27 March 2009, 6 June 2009, 9 September 2009

Language(s)

Script(s)

Sources

Accession area