Colombia - Medellin Power 3 - Report 450 - set
- 01047989
- Unidad documental compuesta
223 resultados con objetos digitales Muestra los resultados con objetos digitales
Colombia - Medellin Power 3 - Report 450 - set
Cyprus - Power 3 - Report 819 - set
P004895: WATER SUP & ENG. - Background correspondence : PCR 6270 - set
P006284: W/SUPPLY-MINAS GERAI - Background correspondence : PCR 5614 - set
P009680: BOMBAY-WATER SUPPLY - Background correspondence : PPAR 5875 - set
P001122: W/S SECONDARY CENTER - Background correspondence : PCR - set
P001251: WATER SUPPLY II (COA - Background correspondence : PCR 5918 - set
P001603: WATER SUPPLY - Background correspondence : PPAR - set
P009200: Kosovo Water Supply Project - Background correspondence : PCR 6591 - set
Argentina - El Chocon Power - Report 1353 - set
Early special evaluation studies working files
The sub-series consists of the working files for special studies and evaluation reviews conducted by OED and its predecessor organization, the Operations Evaluation Unit (later Division) of the Programming and Budgeting Department, prior to the formation of sector-specific divisions in 1983. Reports include sector, country, management, and policy studies.
The series includes the first two evaluation studies conducted by the Operations Evaluation Unit. These studies included a deep study of everything the Bank had done in one country, Colombia, and a wide study evaluating loans to a number of countries in one sector, the electric power sector. The files for the first country study, Bank Operations in Colombia: An Evaluation, Report No. Z-18, 1972, also include a draft and final version of the 1975 Closing Report to Colombia Evaluation which was a follow-up review of the 1972 study to assess what progress had been made on the recommendations contained in the 1972 study. The files for the first sector study, Operations Evaluation Report: Electric Power, Report No. Z-17, 1972, include the 1975 follow-up report, Closing Report on Actions Relating to Recommendations of the Electric Power Evaluation Report of March 1972.
Other sector studies included in this series are: a comparative highway evaluation study; a Development Finance Companies study; a Bank lending for agriculture credit study; reviews of agricultural and rural development programs in Indonesia and the Philippines; and a review of rural development projects in Sub-Saharan Africa. The Department's first three management policy reviews are included and address delays in loan and credit effectiveness, delays in project preparation, and the role and use of consultants. Early operational policy reviews cover project implementation, supervision of Bank projects, and compliance with loan covenants. This series also includes files for OED studies of project monitoring and evaluation and technical assistance pilot evaluation studies conducted in Kenya and Afghanistan.
The study files in this series often contain earlier Bank documents, some dated as early as 1957, relating to the subject of the study. The compilers of these early studies established the practice of soliciting comments on draft studies and reports from all interested parties in the Bank and in the client countries, and most of these study files contain both a series of drafts and the related comments.
Cameroon - Douala and Yaounde Water Supply - Report 1350 - set
Turkey - Cukurova Power (03) and (04) - Report 1372 - set
Liberia - Power (01) and (02) - Report 1551 - set
Singapore - Sewerage 1 - Report 756 - set
Peru - Matucana Power - Report 868 - set
Indonesia - Telecommunications 1 - Report 1646 - set
Ethiopia - Telecommunications 4 - Report 1648 - set
Nepal - First Telecommunications Projec - Report 1843 - set
Brazil - Jaguara Hydroelectric - Report 1852 - set
Brazil - Volta Grand Hydroelectric - Report 1852 - set
Ghana - Power (01) and (02) (ECG) - Report 1568 - set
Tunisia - Water Supply (01) and (02) - Report 1902 - set
Colombia - Bogota Water Supply 1 - Report 2003 - set
Nicaragua - Managua Water Supply and Earthquake Reconstructio - Report 2289 - set
Malaysia - Telecommunications 2 - Report 2268 - set
Panama - Power 2 - Report 2508 - set
Papua New Guinea - Telecommunications 2 - Report 2532 - set
Iran - Telecommunications 2 - Report 2713 - set
Colombia - Chivor Hydroelectric - Report 2720 - set
Guatemala - Telecommunications - Report 2908 - set
El Salvador - Telecommunications 2 - Report 2930 - set
Ecuador - Power 3 - Report 3003 - set
El Salvador - Power 6 - Report 3053 - set
Singapore - Environmental Control - Report 3235 - set
Malaysia - Power 6 - Report 3506 - set
Brazil - Sao Simao Hydroelectric - Reports 3496 and 3500 - set
Mexico - Third Irrigation Project - Impact Evaluation Report - Report 2259 - set
Background documentation : World Bank experience with irrigation development - Report 7876 - 3v
Records of the Director, Operations Evaluation Department
The records in this series contain the reports, correspondence, and studies compiled by the Directors of OED (OEDDR). The Director is selected by the Director-General, Operations Evaluation (DGO), and is responsible for the overall management of the OED. Principal functions include:
assisting the Director-General in making periodic assessments of the adequacy and effectiveness of the operations evaluation system in light of the institutional objectives of the World Bank;
carrying out reviews of the Bank's completion reports and other self-evaluations, performance audits on selected completed projects, impact evaluations, and evaluation studies focusing on operational programs, policies, strategies, and processes;
assisting member countries to develop their own operations evaluation capacities; and
disseminating evaluation findings both within the Bank and to the wider development community.
The series contains the records of Christopher R. Willoughby, who was the first Director of OED. Primarily consisting of memoranda, these records document the early development of the operations evaluation function and of the Operations Evaluation Department in the 1970s. Also contained in this file are records of subsequent OED Directors from the 1980s and 1990s. These records relate to a variety of topics.
Memoranda Files of Director Christopher R. Willoughby
This sub-series is a collection of memoranda and related records compiled by Christopher R. Willoughby who was among the first employees of the Operations Evaluation Unit and was appointed the first director of the Operations Evaluation Department in July 1973.
The second set of files consists of memoranda (dated April 1970 - February 1976) sent and received by Willoughby and his copies of key memoranda documenting the development of the operations evaluation function and the changing position of the Operations Evaluation staff within the Bank. Included are Willoughby's handwritten drafts and final copies of the key issuances affecting Operations Evaluation and his notes from key meetings. One folder contains Willoughby's drafts of a September 29, 1975 memoranda from Mohamed Shoaib, Vice President, Operations Evaluation Division, outlining the history of the evaluation function from 1971 to 1975.
Bolivia - Livestock 3 - Report 3996 - set
Mauritania - Sonader Technical Assistance - Report 3995 - set
Papua New Guinea - Livestock - Report 3997 - set
Sudan - Mechanized Farming 2 - Report 4122 - set
Tanzania - Livestock 2 - Report 4241 - set
Honduras - Livestock 2 - Report 4250 - set
Cameroon - Plaine Des M'Bo Rural Development - Report 4362 - set
Philippines - Aurora-Penaranda Irrigation - Report 4555 - set